Certified
API 6A & ASME B31.3
The Best
World-Class Engineering
Quick-Turn
Delivery in days
Get A Quote
11

PROBLEM: A major oil company was building a new drilling rig in the Gulf of Mexico. They needed a high-pressure piping system for their mud pumps.

SOLUTION: DPR
DPR’s Field Services Solutions Team:
  • Met with the company’s engineering people to determine specifications for the job
  • Assisted with the layout of the piping system, suggesting routing with as few 90-degree turns as possible
  • Provided all piping fabrication drawings
  • Installed the piping system, meeting mandatory deadlines
  • Partnered to complete ancillary fabrication jobs as they arose, using DPR’s extensive in-house inventory
     to supply needed product quickly

DPR is here to help you develop the right solution for your specific needs.