PROBLEM: A major oil company was building a new drilling rig in the Gulf of Mexico. They needed a high-pressure piping system for their mud pumps.
SOLUTION: DPR
DPR’s Field Services Solutions Team:
• Met with the company’s engineering people to determine specifications for the job
• Assisted with the layout of the piping system, suggesting routing with as few 90-degree turns as possible
• Provided all piping fabrication drawings
• Installed the piping system, meeting mandatory deadlines
• Partnered to complete ancillary fabrication jobs as they arose, using DPR’s extensive in-house inventory
to supply needed product quickly
DPR is here to help you develop the right solution for your specific needs.