PROBLEM: A major oil company wanted a managed pressure piping system for its Tension Leg Platform Drilling Rig in the Gulf of Mexico.
SOLUTION: DPR
DPR’s Engineering Team:
• Met with the company’s engineering and operations people to determine the scope of work needed
and specifications for the job
• Surveyed the platform and determined the best piping routing from the managed pressure manifold
• Designed a customized piping solution
• Delivered and installed the completed solution – no field modifications necessary
DPR is here to help you develop the right solution for your specific needs.