Certified
API 6A & ASME B31.3
The Best
World-Class Engineering
Quick-Turn
Delivery in days
Get A Quote
11

PROBLEM: Oil companies are increasing the drilling pressure requirements of the drilling rigs they contract. As a result, a major drilling company needed to upgrade its high-pressure piping system on several drilling rigs.

SOLUTION: DPR
DPR’s Engineering Team:
  • Met with company representatives, traveling to the rig to obtain equipment details and specification
    requirements, survey existing equipment and determine piping routing
  • Designed, manufactured and tested a new high-pressure piping system, building it to meet code and
    the customer’s drilling pressure requirements
  • Installed a high-pressure piping system on multiple rigs capable of handling 7,500 psi

DPR is here to help you develop the right solution for your specific needs.